SiteREADY provided technology project management and Infrastructure Engineering services during the upgrade of our client’s new 27,447 square-foot space. This seven month long project, accommodating 225 employees, was completed in October 2014.
The scope of work included upgrading the existing low-voltage cabling, building out the main data frame with a new network rack, installing new network equipment and circuits; as well as installing new wireless access points and video teleconferencing systems. SiteREADY monitored construction over several project milestones while working in coordination with project partners.
The project team leaders were SiteREADY’s Tony Roberts, who served as Infrastructure Engineering Lead and Ash Simpson, who served as Project Manager.
“This office upgrade was part of an acquisition for our Client. The new site is for their marketing team to showcase infrastructure for clients around the globe to view during site visits. SiteREADY was tasked with implementing a design that would allow for new network integration without hindering the appearance of the existing showcase infrastructure. With SiteREADY’s direction and vendor management, this project was executed successfully and on time,” said Tony Roberts.